The Capital Express Central project proposes to add two non-tolled managed lanes in each direction along I-35 from US 290 East to SH 71/Ben White Boulevard. Managed lanes are proposed in high-congestion areas where right of way is limited. These lanes are designed to provide a less congested route than adjacent general-purpose lanes during peak periods for qualifying vehicles. Managed lanes control access by placing restrictions on use. TxDOT is evaluating a variety of design options to add the non-tolled managed lanes. The project also includes additional safety and mobility improvements.

Need & Purpose

  • Improve safety and mobility

Project Description

  • Add two non-tolled managed lanes in each direction
  • Reconstruct intersections and bridges, increasing bridge clearances and east/west mobility
  • Improve bicycle and pedestrian accommodations along I-35 frontage roads and at east/west crossings

Funding

  • Project development funded by TxDOT
  • Construction not funded

Schedule

  • Finalized schematic and environmental study: anticipated 2023
  • Final design and procurement: contingent on funding
  • Construction start: contingent on funding

Downloads

Project Vicinity Map

 map

CONTACT

Public Information Officer
(512) 832-7000
Email

TxDOT Austin District
P.O. Box 15426
Austin, TX 78761-5426

©2019 Texas Department of Transportation • All Rights Reserved