I-35 from RM 2243 to SE Inner Loop

Overview:

The project includes intersection improvements to alleviate an existing bottleneck at the intersection of RM 2243 and I-35, southbound frontage road improvements, and operational improvements along RM 2243 from Woodmont Drive to Scenic Drive.

Need & Purpose
  • Increase safety and mobility, including eliminating potential conflict points between I-35 entrance and exit ramps
Project Description
  • Replace existing bridge at RM 2243 with a taller, wider bridge that includes three additional designated turn lanes
  • Improve existing southbound I-35 frontage road from RM 2243 to north of SE Inner Loop
  • Add braided entrance/exit ramps along the southbound I-35 frontage road between RM 2243 and SE Inner Loop
  • Provide a northbound to southbound U-turn bridge
  • Improve bicycle and pedestrian sidewalks and paths
Funding
  • Project development funded by TxDOT
  • Construction is funded
  • Construction cost estimate: $37.2 million
Schedule
  • Finalize schematic and environmental documentation: anticipated winter 2020
  • Begin Plans, Specifications and Estimates (PS&E): anticipated winter 2020
  • Complete PS&E: anticipated spring 2023
  • Construction letting: anticipated fall 2023*
  • Construction start: anticipated fall 2023*
  • Construction completion: anticipated fall 2025*

*Dates are contingent on funding.

Downloads

Project Vicinity Map

I-35 from RM 2243 to Southeast Inner Loop

Contact

Public Information Officer

TxDOT Austin District
P.O. Box 15426
Austin, TX 78761-5426

(512) 832-7000

Email